¾ÞÈéÊÓƵ

TEAMS Building (completed 9/2017)

Updated January 2024

Our TEAMS (Technology, Engineering, Art, Maths and Science) facility was completed in September 2017, showcasing Al ¾ÞÈéÊÓƵ’s contemporary way of thinking in regards to important learning environments and student work spaces.

The building provides students with technology-rich, interactive spaces, with a focus on collaboration and individuality. Teaching and learning spaces are based on the concepts of transparency with lots of natural light and large open windows, mobility, adaptability, and student-centeredness. The entire building is technologically advanced with contemporary equipment and a very spacious and atmospheric interior.

This facility has become known as the "green building", is offering our students and staff many amazing destinations, including:

  • Science labs
  • Ceramics, including pottery wheels and kilns
  • Textiles
  • Food Technology
  • Plastics/Woodwork, including a vacuum press and laser cutter
  • Robotics
  • Visual Communication and Design
  • Dining hall/classrooms
  • Breakout spaces and canteen

The TEAMS building often houses our regular school tours, special community events, internal events for Primary and Secondary students like our annual Science, Art & Technology exhibitions, parent workshops and much more.

Al ¾ÞÈéÊÓƵ ¾ÞÈéÊÓƵ is deeply grateful to the Commonwealth Government for contributing $1.725 million towards this building project.